Serving Lufkin & East Texas since 1999Call today: (936) 634-7077
3110 College Dr, Lufkin, TX 75904
Licensed & Insured · USDOT 1938998
24"Cable & fiber

Cable & Fiber Installation

Pulling and terminating power cable, fiber, and copper, whether it is going through the duct we just installed or someone else's.

Pro-Tech crew member with cable installation equipmentClean pulls, proper tension
What it is

The cable is only as good as the pull

Cable gets ruined by the wrong bend radius, too much tension, or a nick on the way in. We pull it right: lubricated, swiveled, and within spec, then terminate and test it so it works the day it is energized and ten years after.

  • Primary and secondary power cable pulls
  • Fiber optic and copper communications
  • Duct-installed or direct-buried
  • Cable racking and support in vaults and handholes
  • Terminations, splices, and pole risers
  • Continuity, insulation, and fiber testing
How we keep it clean

No shortcuts on the pull

Every reel is set up to feed straight, with the bend radius the manufacturer calls for and pulling tension we watch, not guess at.

  • Manufacturer bend radius held at every sweep
  • Lubrication and swivels on long pulls
  • Tension monitored, not eyeballed
  • Ends sealed and labeled before energizing
Utility rig and reel setup on a cable installation jobReel setup
Related work

Often part of the same job

Underground Utilities

The trench, conduit, and duct bank the cable rides in.

See underground

Directional Boring

Trenchless duct for crossings the cable needs to make.

See boring

Electrical Line Work

Transformers, risers, and connections at each end of the pull.

See electrical

Got a set of plans or a stake in the ground?

Send the drawings or call the shop, we'll walk the job and get you a number.

Request a Bid